EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
"Aluminaire"
-
Listing for Category : prototype
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (198)
Finances
- (4)
Research
- (1)
Media
- (5)
CAD
- (3)
Tooling
- (1)
Prototype
- (1)
Flying Pics
- (2)
Workshop
- (4)
Tools
Fuselage
Firewall
Tail Feathers
- (37)
Wings
- (109)
-
Final prep of wings...
-
Completed...
-
Continued...
-
Continued...
-
Design and layout of...
-
Aileron Push Pull...
-
Leading Edge Skin...
-
Leading Edge Skin...
-
Begin Leading Edge...
-
Drag Truss...
-
Fitting tip ribs
-
Wing tip taper
-
Wing tip taper
-
Wing tip taper
-
Wing tip taper
-
Leading Edge Skin...
-
Leading edge and...
-
Inboard Drag Truss...
-
Begin leading edge...
-
Primed,...
-
Wing fabric braces...
-
Aileron Trailing...
-
Aileron Stabilizer...
-
TE Installation
-
Aileron Trailing...
-
Aileron Tip Tunnel...
-
Trailing edge...
-
Aileron Tunnel Tip,...
-
Aileron Tunnel...
-
Aileron Tunnel...
-
Aileron Tip Tunnel...
-
Aileron Tunnel...
-
Left Left aileron...
-
Left Left aileron...
-
Left aileron tunnel,...
-
Right aileron tunnel...
-
Completion of right...
-
Zane Ruckman helping...
-
Wing LE Skin prep...
-
Leading Edge Prep.
-
RH Aileron Skin and...
-
Primary aileron...
-
LH Aileron alignment
-
RH Aileron tip...
-
LH Aileron tip...
-
LH Aileron tip...
-
Fabricating rudder...
-
Aileron Frame Assembly
-
Riveted RH Aileron...
-
Aileron Skin Initial...
-
Aileron parts prep
-
Aileron Hinge...
-
Aileron Part Layout
-
Aileron Hinge...
-
Aileron part prep...
-
Windtip Handhold Insert
-
Wingtip Leading Edge...
-
Windtip Handhold Insert
-
Aileron Tunnel...
-
Wingtip Final Assembly
-
Wingtip Final Assembly
-
Aileron Tunnel -...
-
Begin Drag Truss End...
-
Drag Truss Sleeve...
-
Wing tip taper
-
Completed Leading...
-
Leading Edge Skin...
-
Begin Drag Truss...
-
Bellcrank Mount...
-
Bellcrank Fabrication
-
Right Wing Final...
-
Sam Garcia, EAA 512...
-
Riveted aileron...
-
Location, drilling...
-
Design and...
-
Disassembly of ribs...
-
Riveted center...
-
Completed rib...
-
Fabrication of spar...
-
Complete initial...
-
Initial positioning...
-
Wing spar...
-
Wing attach plate...
-
Spar priming and rib...
-
Rib Bracket cutting,...
-
Wingtip layout and...
-
Spar attach and lug...
-
Lug double plate...
-
Milling wing spar...
-
Aileron hangar...
-
Wing rib bracket...
-
Wing spar tip layout...
-
Wing spar lug plate...
-
Wing spar lug plate...
-
Wing spar lug plate...
-
Wing spar lug plate...
-
Wing spar attach end...
-
Wing spar attach end...
-
Wing spar attach end...
-
Rib Prep - Capstrip...
-
Wing Rib Prep &...
-
More wing parts -...
-
Wing Rib deburr and...
-
Lightening hole...
Controls
Landing Gear
- (1)
Lighting
- (19)
Instrument Panel
- (3)
Avionics
- (2)
Engine
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
W&B
- (1)
Kit
- (2)
AirVenture
- (1)
EAA Speaker
- (1)
Young Eagles
Builder Name:
Glenn Gordon
-
Project:
Timber Tiger - ST-L Clipped-wing
-
VIEW REPORTS
Total Hours:
583.9
Start/Last Date:
Jun 01, 2022 - No Finish Date
Engine:
Rotax 912ULS with big bore cylinder upgrade
Propeller:
Sensenich Ground Adjustable
Panel:
VFR / Glass / ADS-B / Comm / Xpndr / 2 Axis Autopilot
Friendly URL:
https://eaabuilderslog.org?s="Aluminaire"
Home or Last Project Picture
Jan 05, 2022
Prototype Construction
Category: Prototype
Prototype Construction
53218967_2070728349643279_6119681866782998528_o.jpg
53395048_2070728366309944_4486133816443797504_o.jpg
54405580_2070728336309947_3729926758657425408_o.jpg
IMG_20180508_143429426.jpg
IMG_20190130_144413316.jpg
IMG_20190130_144415701.jpg
IMG_20190130_144419416.jpg
IMG_20190214_080925924.jpg
IMG_20190214_092231674-scaled.jpg
IMG_20190214_183919138.jpg
IMG_20190215_153921836-scaled.jpg
IMG_20190307_130906187.jpg
IMG_20190307_130924226.jpg
IMG_20190307_163147901.jpg
IMG_20190311_173942107-scaled.jpg
IMG_20190621_105246763.jpg
IMG_20190621_130507251.jpg
IMG_20190621_132952144.jpg
IMG_20190621_175556125.jpg
IMG_20190621_184355760.jpg
IMG_20190621_184434531.jpg
IMG_20190621_184447515.jpg
received_2124956101134981.jpeg
received_2228464854136507.jpeg
received_2303653503026058.jpeg
received_2404331009790424.jpeg
received_300825077488621.jpeg
received_304411917113905.jpeg
received_343259563058558.jpeg
received_375949596598903.jpeg
received_402809220566200.jpeg
received_433404563904618.jpeg
received_689957258102611.jpeg
received_706700463101943.jpeg
received_771802086547370.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.